MCP server · trust report

io.github.HorizunGroup/horizun-msproject-mcp

Only 1 of 6 checks could run, which is below the bar to certify — nothing that ran raised a red flag.

Publisher
io.github.HorizunGroup
Repository
github.com/HorizunGroup/horizun-msproject-mcp
Install
remote only
Versions
1
Inspected
1 of 6 checks · 25%
Scored
2026-09-11 · rubric 1.0.0

What we checked

Six static checks, weighted by risk. Every result reflects only what could be observed in the published package and repository — never intent.

6 checks1 clean5 not inspected
  • Injection surface

    unscannable25% of grade

    Tool descriptions/manifest scanned for instruction-injection patterns (imperatives at the model, hidden text, 'ignore previous', data-exfil URLs).

    No tool descriptions, server instructions, prompts, or resources were fetched; nothing to scan for injection.

  • Supply chain

    pass25% of grade

    Package provenance: namespace verification, repo linkage, maintainer count, account age, postinstall scripts, typosquat distance.

    repository linkage verified

  • Credential hygiene

    unscannable15% of grade

    How the server takes secrets (env vs plaintext config vs hardcoded); secrets appearing in tool schemas.

    No source files, package manifest, or tool schemas were fetched; cannot assess credential handling.

  • Permission scope

    unscannable15% of grade

    Declared tools vs. breadth (filesystem, network, exec); flags shell-exec and unbounded filesystem access.

    No source files, package.json, or pyproject were fetched; cannot infer capability scope.

  • Version behavior

    unscannable10% of grade

    Diff of tool definitions between versions; new permissions or changed descriptions in a patch release (the postmark-mcp class).

    no prior version to diff (first sight of io.github.HorizunGroup/[email protected]); version-drift / rug-pull cannot be evaluated. Cold-start risk is covered by point-in-time checks (injection_surface, supply_chain, credential_hygiene), not here.

  • Transport config

    unscannable10% of grade

    Remote servers: TLS and auth mode (none/token/OAuth). Local servers: whether the manifest indicates it phones home.

    local stdio server: no remote transport or auth surface, and no phone-home/telemetry signal found in source. Absence of transport findings is NOT a safety guarantee — phone-home hosts can be constructed at runtime and defeat static analysis.

Version history

Each release plotted by grade against the safe line at B. A version that sinks below the line has lost its trusted standing — the shape of a rug-pull.

VersionPublishedGradeScoreInspectedChange
v1.0.2 · current2026-08-04 insufficient—1/6 · 25%—