MCP server · trust report

io.github.theluckystrike/change-order

Clean across every one of the 4 checks that ran, but only 65% of the server could be inspected — so an A isn’t earned yet and the grade is held at B.

Publisher
io.github.theluckystrike
Repository
github.com/theluckystrike/mcp-servers
Install
remote only
Versions
2
Inspected
4 of 6 checks · 65%
Scored
2026-09-07 · rubric 1.0.0

What we checked

Six static checks, weighted by risk. Every result reflects only what could be observed in the published package and repository — never intent.

6 checks4 clean2 not inspected
  • Injection surface

    unscannable25% of grade

    Tool descriptions/manifest scanned for instruction-injection patterns (imperatives at the model, hidden text, 'ignore previous', data-exfil URLs).

    No tool descriptions, server instructions, prompts, or resources were fetched; nothing to scan for injection.

  • Supply chain

    pass25% of grade

    Package provenance: namespace verification, repo linkage, maintainer count, account age, postinstall scripts, typosquat distance.

    repository linkage verified

  • Credential hygiene

    pass15% of grade

    How the server takes secrets (env vs plaintext config vs hardcoded); secrets appearing in tool schemas.

    No hardcoded secrets, secret-shaped tool parameters, or leaked keys found. PASS = no static red flag; static analysis cannot prove the code honors env-based secret handling at runtime.

  • Permission scope

    pass15% of grade

    Declared tools vs. breadth (filesystem, network, exec); flags shell-exec and unbounded filesystem access.

    No shell-exec, unbounded/sensitive filesystem, or download-and-run primitives found in scanned source. PASS = no static red flag. Static scanning is blind to code fetched or executed at runtime.

  • Version behavior

    unscannable10% of grade

    Diff of tool definitions between versions; new permissions or changed descriptions in a patch release (the postmark-mcp class).

    no prior version to diff (first sight of io.github.theluckystrike/[email protected]); version-drift / rug-pull cannot be evaluated. Cold-start risk is covered by point-in-time checks (injection_surface, supply_chain, credential_hygiene), not here.

  • Transport config

    pass10% of grade

    Remote servers: TLS and auth mode (none/token/OAuth). Local servers: whether the manifest indicates it phones home.

    remote endpoint "https://mcp.zovo.one/mcp/change-order" uses TLS (https); remote endpoint uses static token / bearer auth (acceptable)

Version history

Each release plotted by grade against the safe line at B. A version that sinks below the line has lost its trusted standing — the shape of a rug-pull.

VersionPublishedGradeScoreInspectedChange
v0.21.0 · current2026-09-07 B1004/6 · 65%—